Vertical Roof & A-Frame Metal Garages | Sentinel Steel Structures
North Carolina steel building dealer · Free quotes
Call or text (336) 559-4207
Garages · Vertical & A-Frame Garages

Peaked roofs that shed weather.

Both styles give you a true peak and boxed eaves. The difference is panel direction — and on longer buildings or anywhere with real snow, vertical is the one to pick.

BOXED EAVESVERTICAL OR HORIZONTAL PANELSBEST IN SNOW
Vertical roof · vertical walls
FIG. 01 · Vertical roof · vertical wallsExample build
What to know

A-frame for looks. Vertical for performance.

An A-frame roof has the house-style peak and boxed eaves, but panels still run side to side. It sheds better than a regular roof and costs a little more.

A vertical roof turns the panels to run top to bottom over hat channel with a ridge cap. Rain, snow and leaves slide straight off instead of sitting in the ribs. It’s usually required past about 30′ long.

SPEC SHEETVERTICAL & A-FRAME GARAGES
A-Frame panelsHorizontal
Vertical panelsTop-to-bottom + ridge cap
RequiredUsually over 30′ long
SnowVertical strongly recommended
WallsHorizontal or vertical panels

Exact sizes and options confirmed on your quote.

Common configurations
24′ × 25′

A-Frame two-car

House-style look on a budget in mild weather.

24′ × 36′

Vertical shop

Long enough that vertical is the right call.

30′ × 50′

Vertical, certified

Rated wind and snow loads for exposed sites.

Example builds

Photos show the style of building. Your quote is drawn to your size, colors and openings.

Long garage · peaked roof
Long garage · peaked roofFIG. 02
Boxed-eave two-car
Boxed-eave two-carFIG. 03
Roof style options

Three roofs. One honest comparison.

Most garages go vertical — it’s the roof that keeps water off your walls and out of your doors.

01
MILD WEATHER

Regular

Rounded eaves and horizontal roof panels. The most affordable option and perfectly fine for short buildings in mild climates — but horizontal panels can hold water and debris.

02
BOXED-EAVE LOOK

A-Frame

A true peaked roof with boxed eaves, so it looks like a house-style building. Panels still run horizontally, so it sheds better than regular but not as well as vertical.

03
BEST IN SNOW & RAIN

Vertical

Panels run top to bottom over hat channel with a ridge cap, so rain, snow and leaves slide straight off. Usually required on longer buildings, and worth the upgrade anywhere that sees real snow.

Options & add-ons

Build it the way you’ll use it.

Every option is priced line by line on your quote, so you can see exactly what each upgrade adds. Crimson, Gallery Blue, Patina Green and Copper carry a color upcharge.

  • +Enclosed sides & ends
  • +Lean-tos, one or both sides
  • +Walk-in doors
  • +Windows
  • +Framed roll-up door openings
  • +Spray foam insulation
  • +18 colors — roof, sides & trim chosen separately
  • +Wainscoting (two-tone lower band)
  • +26-gauge panel upgrade
  • +12-gauge frame upgrade
  • +Certified wind & snow ratings
  • +Color-matched screws
No surprise invoices

What’s in your price — and what’s quoted separately.

INCLUDED

In your building price

  • The building as spec’d — frame, roof, sides and trim
  • Framed openings for every door and window on your order
  • Factory crews deliver & install, with freight disclosed on your quote
  • Anchoring matched to your surface — ground, gravel, asphalt or concrete
QUOTED SEPARATELY

Listed on your quote, before you pay

  • $Overhead roll-up doors — may be installed by a partner door company on a later visit
  • $Concrete slab
  • $Site grading — your site must be within 3″ of level and clear of obstacles
  • $Permits — the owner’s responsibility; we’ll tell you what to ask
  • $Engineered drawings — typically starting around $400, non-refundable

NOTE — If it costs money, it’s on your quote in writing before your first payment. Order minimums vary by region; we’ll confirm what applies to your address.

Get a straight price on your building.

Tell us what you're covering and where it's going. Same-day response with options, a real price, and the current lead time.