Prefab Metal Garages — Factory-Fabricated, Installed On Site | Sentinel
North Carolina steel building dealer · Free quotes
Call or text (336) 559-4207
Garages · Prefab Garages

Fabricated at the factory. Standing in a day.

Every frame member is cut and formed before it leaves the shop, so install day is assembly, not construction. Standard builds usually go up in a single day on a level, prepared site.

FACTORY-FABRICATEDUSUALLY 1-DAY INSTALLBOLT-TOGETHER FRAME
Prefab garage · two roll-ups
FIG. 01 · Prefab garage · two roll-upsExample build
What to know

Why prefab beats stick-built for most garages.

A prefab steel garage arrives as engineered components — legs, trusses, hat channel, panels and trim — matched to your order. The factory crew assembles it on your pad and anchors it to your surface.

That means no framing crew for weeks, no lumber price swings, and no rot or termites later. Your job is the site: level within 3″, clear of obstacles, and reachable by a truck and trailer.

SPEC SHEETPREFAB GARAGES
Install timeUsually 1 day (standard builds)
SiteWithin 3″ of level, clear
Lead time4–8 weeks by region
Frame14-ga galvanized · 12-ga upgrade
AnchoringMatched to your surface

Exact sizes and options confirmed on your quote.

Common configurations
12′ × 21′

Single-car

A quick, secure box for one vehicle.

20′ × 25′

Two-car

The everyday standard.

30′ × 30′

Three-bay

Vehicles plus a tool corner.

Example builds

Photos show the style of building. Your quote is drawn to your size, colors and openings.

Frame going up on the slab
Frame going up on the slabFIG. 02
Crew skinning the walls
Crew skinning the wallsFIG. 03
Roof style options

Three roofs. One honest comparison.

Most garages go vertical — it’s the roof that keeps water off your walls and out of your doors.

01
MILD WEATHER

Regular

Rounded eaves and horizontal roof panels. The most affordable option and perfectly fine for short buildings in mild climates — but horizontal panels can hold water and debris.

02
BOXED-EAVE LOOK

A-Frame

A true peaked roof with boxed eaves, so it looks like a house-style building. Panels still run horizontally, so it sheds better than regular but not as well as vertical.

03
BEST IN SNOW & RAIN

Vertical

Panels run top to bottom over hat channel with a ridge cap, so rain, snow and leaves slide straight off. Usually required on longer buildings, and worth the upgrade anywhere that sees real snow.

Options & add-ons

Build it the way you’ll use it.

Every option is priced line by line on your quote, so you can see exactly what each upgrade adds. Crimson, Gallery Blue, Patina Green and Copper carry a color upcharge.

  • +Enclosed sides & ends
  • +Lean-tos, one or both sides
  • +Walk-in doors
  • +Windows
  • +Framed roll-up door openings
  • +Spray foam insulation
  • +18 colors — roof, sides & trim chosen separately
  • +Wainscoting (two-tone lower band)
  • +26-gauge panel upgrade
  • +12-gauge frame upgrade
  • +Certified wind & snow ratings
  • +Color-matched screws
No surprise invoices

What’s in your price — and what’s quoted separately.

INCLUDED

In your building price

  • The building as spec’d — frame, roof, sides and trim
  • Framed openings for every door and window on your order
  • Factory crews deliver & install, with freight disclosed on your quote
  • Anchoring matched to your surface — ground, gravel, asphalt or concrete
QUOTED SEPARATELY

Listed on your quote, before you pay

  • $Overhead roll-up doors — may be installed by a partner door company on a later visit
  • $Concrete slab
  • $Site grading — your site must be within 3″ of level and clear of obstacles
  • $Permits — the owner’s responsibility; we’ll tell you what to ask
  • $Engineered drawings — typically starting around $400, non-refundable

NOTE — If it costs money, it’s on your quote in writing before your first payment. Order minimums vary by region; we’ll confirm what applies to your address.

Get a straight price on your building.

Tell us what you're covering and where it's going. Same-day response with options, a real price, and the current lead time.