Steel Building FAQ — Lead Times, Permits, Payments & Install | Sentinel
North Carolina steel building dealer · Free quotes
Call or text (336) 559-4207
Straight answers

Questions people ask before they order.

Lead times, payments, permits, site prep and what happens on install day — answered plainly, with the fine print included.

01

Ordering & Pricing

How long until my building is installed?

Right now, typically 4–6 weeks in the Carolinas, Southeast and Texas; 4–8 weeks in the Arkansas region; and 6–8 weeks in the Midwest, Ohio Valley and Northeast. Commercial-grade buildings (31′–70′ wide) run 6–8 weeks everywhere. All lead times are weather permitting.

The clock starts once three things are in: 60% of your balance, site photos and the drawing fee. Not at first contact, and not when you get a quote.

Lead times shift with the season, so we’ll give you the current number for your address before you commit. In the Northeast, order by September 15 for a same-year install.

What’s the payment schedule?

Orders of $5,000 and up: 60% before scheduling, 30% before installation and 10% on completion. Orders under $5,000: 60% before scheduling and 40% on completion.

We accept cashier’s checks, money orders and cards (a convenience fee applies to card payments). We can’t accept personal or company checks. Your exact schedule is printed on the order documents before you sign.

What’s the drawing fee?

If your county requires engineered drawings, the fee typically starts around $400. Site-specific drawings are priced by complexity, and drawing fees are non-refundable.

If your county confirms in writing that no permit or drawings are needed, we’ll talk through whether drawings still make sense for your build. Either way, the fee is on your quote before you pay anything.

Can I change my order after I place it?

Usually, yes — call us as early as possible. Changes before the building is scheduled for fabrication are the easiest; changes after that may affect price and lead time.

Additions to an existing building are handled differently: they’re paid in full before scheduling, are non-refundable, and an exact color match to the original isn’t guaranteed.

02

Site & Permits

Does my site have to be level?

Yes. The site needs to be within 3 inches of level across the whole footprint and clear of obstacles, or the crew may not be able to install. An unlevel pad is the number-one reason an install day fails.

Grading is quoted separately or handled by your own contractor. Remember the frame is 1′ shorter than the roof length, so size your pad to the frame.

Do I need a permit?

It depends on your county. Some require nothing; others require a permit and engineered drawings, and some states require certified buildings.

Permits are the owner’s responsibility, but we’ll tell you exactly what to ask your county office and supply engineered drawings if they’re required.

Ground, gravel, asphalt or concrete — which is best?

All four work for most buildings; the anchors change with the surface. Ground uses rebar anchors, gravel uses longer anchors, asphalt uses asphalt anchors and concrete uses wedge anchors.

Concrete is recommended for enclosed shops and is required for commercial-grade buildings and in Seismic Zone D. If you pour, the flat portion of the slab should equal the exact frame size, and we recommend a 3½″ × 3½″ sheeting ledge (a rat guard) around the edge. Our drawings don’t support footer installs.

03

Delivery & Installation

Who builds and installs it?

Sentinel is an authorized dealer. An American manufacturer fabricates your building, and their factory crews deliver and install it, with freight disclosed on your quote.

We spec the building with you, place and manage the order, and stay on it from first payment through install day.

Are roll-up doors included?

The framed openings are included in your building price. Overhead roll-up doors are listed separately on your quote.

Roll-up doors may be installed by a partner door company on a later visit, usually a week or two after the building goes up.

Is there a freight charge?

A freight fee may apply based on drive time from the fabrication shop, and it’s required on commercial-grade buildings. If it applies to you, it’s on your quote before you pay anything.

04

Warranty & After the Sale

What’s the warranty?

Buildings carry manufacturer-backed warranties; terms vary by component — frame, panels and paint are covered differently. We’ll send the current warranty documents with your quote so you can read them before you buy.

Steel buildings aren’t airtight, and leaks at the base rail aren’t covered — which is one more reason a level, properly prepared pad matters.

What should I check before the crew leaves?

Walk the building with the crew. Check that doors and openings are where you ordered them, panels and trim are secure, and the anchors are in. If something looks off, raise it then — and call us. We stay on it until it’s right.

Still have a question? Text us.

A real person reads every message. Send a photo of your site or a rough sketch and we’ll take it from there.

Get a straight price on your building.

Tell us what you're covering and where it's going. Same-day response with options, a real price, and the current lead time.