From first call to standing steel.

Five steps, in order, with nothing hidden. You’ll know the price, every fee and the lead time before you pay — and exactly when the clock starts.

Steel frame going up on a concrete slab
FIG. 01 · Frame going up · install dayFactory crew
STEP 01

Tell us what you need

Call, text or send the form. A rough idea is enough — “cover for two trucks and a tractor” gets us started. Have a ZIP code handy so we can confirm your region and lead time.

WHAT TO SEND USSTEP 01
What you’re coveringTrucks, tractor, RV…
Rough sizeOr we’ll help size it
Install addressZIP is enough to start
SurfaceGround · gravel · asphalt · concrete
Tallest vehicleMeasured, not guessed
Same-day response during business hours.
STEP 02

Spec it and get a straight price

We build it with you: size, roof style, leg height, doors, windows, colors and certification. You get a written quote with every line item, the full fee breakdown and the current lead time for your region.

QUOTE · LINE ITEMSSTEP 02
Building as spec’dFrame · roof · sides · trim
Framed openingsIncluded
Roll-up doorsListed separately
FreightDisclosed on quote
Engineered drawingsTypically from ~$400
Lead timeCurrent for your region
If it costs money, it’s on this sheet before you pay.
STEP 03

Order, first payment and site photos

You sign the order, make your first payment and send photos of the site. If your county needs engineered drawings, the drawing fee is paid here too — drawing fees are non-refundable.

THIS IS WHEN YOUR LEAD TIME STARTS
0160% of your balancePaid by cashier’s check, money order or card.
02Site photosSo the crew knows the ground before they arrive.
03Drawing feeTypically starting around $400, if your county requires drawings.

Not at first contact. Not at quote. After all three.

STEP 04

Prep your site

The crew builds on what you give them. A level, clear, reachable site is the difference between a one-day install and a rescheduled one.

  • Within 3″ of level across the whole footprint
  • Clear of trees, stumps, rocks and debris
  • Truck and trailer can reach the site
  • Utilities marked before anchors go in
  • Permits in hand (owner’s responsibility)
  • Concrete: flat portion = exact frame size; 3½″ × 3½″ sheeting ledge recommended
Slab with sheeting ledge · 24′ × 30′
Slab with sheeting ledge · 24′ × 30′
STEP 05

Delivery and installation

Factory crews deliver and install — usually in a single day for standard builds — with freight disclosed on your quote. Roll-up doors may be installed by a partner door company on a later visit.

Walk the building with the crew before they leave. Steel buildings aren’t airtight, and minor base-rail leaks aren’t covered, so look it over together.

Crew skinning the walls
Crew skinning the walls
Payment schedule

How payments are staged.

Your exact schedule is printed on the order documents before you sign. Here’s how it typically breaks down.

ORDERS $5,000 AND UP
60%Before scheduling
30%Before installation
10%On completion
ORDERS UNDER $5,000
60%Before scheduling
40%On completion
HOW TO PAY
  • Cashier’s check
  • Money order
  • Card — convenience fee applies
  • No personal or company checks

Additions to existing buildings are paid in full before scheduling and are non-refundable; color match isn’t guaranteed.